MRT-3 adds 2 trains to lessen queuing time

-A A +A

Thursday, June 26, 2014


THE Metro Rail Transit 3 (MRT-3) management has deployed two additional light rail vehicles (LRVs) or coaches previously on standby at the depot to somewhat improve the rail system’s ability to meet passenger demands, the Department of Transportation and Communications (DOTC) said Thursday.

Transportation and Communication Secretary Joseph Emilio Abaya said that with additional two LRVs, the number of running coaches now rose to 20, which translates to an increased capacity of 2,364 passengers per hour per peak direction (PPHPD).

"Passenger convenience is of course always a concern, so we hope this helps riders somewhat in their daily commute by reducing their queuing time and taking them to their destinations faster," he said.

Citing MRT-3's report, he said the transit line had a carrying capacity of 17,730 PPHPD prior to the additional coaches' deployment. It now stands at 20,094.

As a result, queuing time has significantly decreased especially in congested stations, where long lines along street levels are now cleared as early as 8 a.m. as opposed to the previous 9 a.m., Abaya said.

The additional deployment began in the first week of June on orders of its officer-in-charge, Honorito Chaneco, shortly after he assumed responsibility over MRT-3.

"When I was made responsible for MRT-3's operations, my priority was to look for technical solutions which would improve services within the system’s limitations. One of our first actions was to deploy these additional coaches. This necessarily included an adjustment to train timetables, which took about a week to do. We also began implementing the skipping train scheme, which we have been doing for LRT (Light Rail Transit) 1 and 2," said Chaneco.

The skipping trains go straight to any congested station once it starts becoming overcrowded. MRT-3 stations are closely monitored by management throughout the system's daily operating hours to enable real-time response. This scheme thus provides additional relief to passengers in congested stations.

The skipping train scheme has taken the place of the proposed MRT Express Train service, which also aimed to move passengers faster to their destinations during the most congested times. The Express service was tested last May, but it did not reach the regular implementation stage.

MRT-3 management assured the public that it will continue its efforts in improving the train system.

From 2015 to 2017, DOTC said that 48 brand new coaches will be delivered in tranches to address the overcapacity of MRT-3.

Under its contract, the train supplier has 18 months, or until the third quarter of 2015, to deliver its prototype unit for testing before the rest of LRVs arrive on a monthly basis. (SDR/Sunnex)

DISCLAIMER: Sun.Star website welcomes friendly debate, but comments posted on this site do not necessary reflect the views of the Sun.Star management and its affiliates. Sun.Star reserves the right to delete, reproduce or modify comments posted here without notice. Posts that are inappropriate will automatically be deleted.

Forum rules: Do not use obscenity. Some words have been banned. Stick to the topic. Do not veer away from the discussion. Be coherent and respectful. Do not shout or use CAPITAL LETTERS!
Sun.Star Jobs
  • Obituary
  • Pnoy
  • Filipino Abroad
  • goodearth
  • Pacman blog
  • Philippine Polls
  • Calamity Report
  • Habemus Papam
  • Technology
  • Sunstar Multimedia
  • Sun.Star Zup!
  • tell it to sunstar
  • Festivals
  • SunStar Celebrity
  • ePaper
  • Sinulog