Back to homepage
| Bacolod | Baguio | Cagayan de Oro | Cebu | Davao | Dumaguete | General Santos | Iloilo | Manila | Pampanga | Pangasinan | Zamboanga |
 
 
 
 

Google
Web
www.sunstar.com.ph

  Local News
Fiscals to inhibit in sedition case
Police exec says Capitol siege a necessary evil
Topping ceremony of new Iloilo airport set Friday
Iloilo police implement strict frisking and checkpoints in food festival




Friday, January 26, 2007
Topping ceremony of new Iloilo airport set Friday

SENATOR Franklin M. Drilon leads the topping ceremony of the international airport in Iloilo City on Friday signaling its near-completion after eight years of planning and actual construction.

Drilon, who will be ending his second term as senator in June, considers the completion of the Iloilo airport project as one of his most significant achievement as a public servant.

Sun.Star Network Online's Sinulog Festival Coverage
Post your Sinulog greetings

"This is my way of expressing faith in the development and the future of my home town. My kasimanwa will greatly benefit from this new airport," Drilon said.

According to a report of the Department of Transportation and Communication (DOTC), the airport is now 97 percent complete and will be operational in April this year.

"The New Iloilo Airport will bring a new level of comfort, traveling convenience and efficiency to passengers across the nation and the world," Drilon, who is also president of the Liberal Party, said.

Joining Drilon in the walk-through inspection of the airport on Friday are DOTC Secretary Leandro Mendoza, Iloilo Governor Niel Tupas, Sr. and other Iloilo local government officials.

Drilon, a native of Iloilo, played a lead role in the completion of the P8.7 billion Iloilo airport project in the past eight years. He was part of the steering committee which oversees the project implementation. In November 1998, then President Joseph Estrada issued a memorandum creating the Iloilo Airport Coordinating Committee, with Drilon as adviser.

The three-story passenger terminal, about 12,000 sq. meter in floor area, houses the baggage conveyor on the first floor, the check in area and the airline offices on the second floor and the pre-departure area on the third, and the arrival area along the corridors that lead to the first floor. The airport can accommodate six aircrafts simultaneously parking at a time. Air navigation systems, including a radar area is also in place.

The project was launched in Iloilo in January 2004. The airport is seen to increase air passenger and cargo traffic in the province and its influence areas to boost economic development in Western Visayas.

The new airport is sprawled in 188-hectare site between the towns of Cabatuan and Sta. Barbara, located 19 kilometers north of Iloilo City. The plan is to convert the area into a commercial, residential and semi-industrial district. It will be a domestic trunk line airport that will replace the existing airport in Mandurriao.

"The rise of a first-rate airport in Western Visayas that is compliant with international standards is crucial to the development of the country. This will boost our air transportation services, making the Philippines more accessible to the rest of the world," Drilon said.

For more Philippine news, visit Sun.Star Cagayan de Oro.

(January 26, 2007 issue)
Write letter to the editor. Click here.
Join the Sun.Star message board. Click here.




ENETWORK HEADLINE
Arroyo signs into law automation of 2010 polls

ENETWORK NEWS
100 farmers take over banana farm
Intel officer says Capitol siege a necessary evil
Lapu-Lapu proclaimed highly urbanized city


[return to top] [home] [network page]


Sun.Star Network Online

LOCAL NEWS
BUSINESS
OPINION
SPORTS
LIFESTYLE
FEATURE

RSS FeedRSS Feed

Classified Power Ads

Past Issues




I © Copyright 2002 - 2006 Sun.Star Publishing, Inc. I Contact the website at onlinedeskatsunstardotcomdotph I