TACLOBAN

Tacloban new bus terminal building nears completion

THE three-level building at the Tacloban City new bus terminal is already 98-percent complete.

Terminal Manager Noli Naval said the contractor's representative already wrote to Mayor Alfred Romualdez to signify intent to a partial turnover of the said building.

“This request for a (partial) turnover is to ensure the proper safekeeping of all equipment and devices installed in the building,” said the City Information Office (CIO), quoting Naval.

The three-level terminal building is “self-sufficient” as it is built with a water system and fire hydrant at each level, CIO said.

Once completed, the terminal can accommodate 11 buses on the ground floor and up to 80 jeepneys or vans on the second and third levels.

It is also equipped with a generator set, public toilets, and a PWD (persons with disabilities) ramp for the convenience of the riding public. (SunStar Philippines)


VIEW COMMENTS
DISCLAIMER:

SunStar website welcomes friendly debate, but comments posted on this site do not necessarily reflect the views of the SunStar management and its affiliates. SunStar reserves the right to delete, reproduce or modify comments posted here without notice. Posts that are inappropriate will automatically be deleted.


Forum rules:

Do not use obscenity. Some words have been banned. Stick to the topic. Do not veer away from the discussion. Be coherent. Do not shout or use CAPITAL LETTERS!

sunstar.com.ph